How we work
The calculation comes
before the quote.
That ordering is the whole argument. Quote first and the calculation becomes a document that has to agree with a number you already signed. Calculate first and the number is just what the house needs.
- 01
A call, not a visit
Fifteen minutes on the phone tells us whether this is worth either of our time. Roughly a third of these calls end with us saying not yet, and that is a fine outcome.
- 02
The survey
Two to three hours in the house. Every room measured, every radiator recorded, the fabric assessed. You get the heat loss calculation itself, not a summary of it.
- 03
The quote
One price, itemised, with the grant already deducted. If radiators need changing they are on the quote as a line, never a surprise after the units arrive.
- 04
The install
Three to five days for a typical house. The old system stays live until the new one is commissioned, so you are never without heating overnight.
- 05
Commissioning and handover
Flow temperature set against the actual calculation, controls explained once properly, and the paperwork for the grant filed by us.
The grant
£7,500 off, before you pay anything
Paid to us, not to you. It comes off the quote before you pay anything. We do the application as part of the job, and you see it as a deduction on the quote rather than as money you chase afterwards.
Asked often